Safety first
- Requester spots a facilities problemRequester
For staff, tenants and facilities teams: decide if a building problem is an emergency, urgent or routine, who to contact, and how to log it.
Response targets below are common examples. Use the targets in your own policy or lease.
- Is anyone hurt or in immediate danger?Requester
For example fire, smoke, someone injured or trapped, live wires exposed, or a structural collapse.
- Yes: go to step 3, Call emergency services first
- No: go to step 6, Check for gas, water and power hazards
- Call emergency services firstRequester
Use your local emergency number, for example 911 in the US or 999 in the UK. Get people out of danger only if it is safe to do so.
- Tell facilities once everyone is safeRequester
- Emergency handled by emergency servicesRequester
- Check for gas, water and power hazardsRequester
- Do you smell gas or hear a hissing noise?Requester
- Get everyone out and call the gas emergency lineRequester
Ready.gov advises: open a window, get everyone out quickly, and call the gas company from outside, for example a neighbour's home.
In Great Britain, HSE lists the gas emergency number 0800 111 999. If you know where it is, shut off the gas at the meter control valve.
Only a qualified professional should turn the gas back on.
- What kind of problem is it?Requester
- Water leak or flood: go to step 10, Is water spreading or near electrics?
- Power or electrical: go to step 13, Is there sparking, burning smell or a full outage?
- Heating or cooling: go to step 15, Is the space unsafe or unusable?
- Something else: go to step 18, Log a work order in the system
- Is water spreading or near electrics?Requester
- Shut off water at the valve if you know where it isRequester
Keep people away from water near sockets, panels or equipment, and tell facilities the water is near electrics.
- Contain it with towels or a bucketRequester
Then go to step 17, Report it to facilities as urgent
- Is there sparking, burning smell or a full outage?Requester
- Yes: go to step 14, Keep people clear of the area
- No: go to step 17, Report it to facilities as urgent
- Keep people clear of the areaRequester
- Is the space unsafe or unusable?Requester
For example no heating in freezing weather, or overheating in a server room or with vulnerable people.
For example a dripping tap, a stuck door, a broken light in an office, or cosmetic damage.
- Yes: go to step 17, Report it to facilities as urgent
- No: go to step 18, Log a work order in the system
Report and log
- Report it to facilities as an emergencyRequester
Phone, do not just email. Out of hours, call the on-call or emergency maintenance number in your building guide, lease or intranet.
Example target: someone on site within 1 to 4 hours, or as your policy states.
Then go to step 18, Log a work order in the system
- Report it to facilities as urgentFacilities
Phone or use the urgent option in your work order system. Example target: attend within 24 hours.
- Log a work order in the systemFacilities
Give the exact location (building, floor, room), what is wrong, when it started, photos, your contact number and access times.
Routine requests go here first. Emergency and urgent calls are logged here too, after the phone call. Example routine target: 5 to 10 working days.
- Review and confirm the priorityFacilities
Check the request against your priority matrix. Change the priority if the facts differ from the report, and tell the requester.
- Is it in scope for facilities?Facilities
- Redirect to the right team and tell the requesterFacilities
For example IT equipment, a landlord's responsibility, or a contractor under warranty.
- Assign a technician or contractorFacilities
Fix and close
- Schedule the work with the requesterFacilities
Agree access, any disruption, and whether parts need ordering. Give an expected completion date.
- Complete the work and record what was doneFacilities
Record time, parts, cost and the root cause if found. Add before and after photos.
- Did the requester confirm it is fixed?Facilities
- No: go to step 26, Reopen the work order
- Yes: go to step 27, Close the work order
- Reopen the work orderFacilities
- Close the work orderFacilities